- Overview
- Product Description
- Product Parameters
- Our Advantages
- Certifications
- Why choose us
- Company Profile
- Our clients
- FAQ
Basic Info.
Product Description
120/100mm Steel Chrome Plated Stamping Part Metal Hardware Stainless Steel Removable Folding Chest Handle Stainless Steel 304 Cabinet Door Pull Handle
Material | Steel |
Treatment | Chrome-plated |
Weight | OEM |
Management Certification | ISO9001:2015 |
Origin | Shandong China |
OEM orders | accept |
Samples | for free |
1. professional in manufacturing and exporting for many years;
2. Made from different materials and different surface plated;3. Years of experience in manufacturing and exporting;
4. All sorts of stamping parts can be manufactured according to the customer's requirement, drawing, design, or samples.
Product application
Heavy wooden boxes, assembly boxes, import, and export packing boxes, mechanical equipment, aviation equipment, monitoring equipment, and all kinds of high-end equipment.
Vehicles, medical equipment, engineering machinery, toolbox, industrial case, box cover.



Environmental safety and health certification
Environmental impact reportAAA credit enterprise Shandong hardware chamber of commerce governing unit

in-sale: Professional technical service team, 3D animation demonstration products, improve products, shorten the product development cycle.
LAIZHOU HUIDING Hardware Co., LTD is a manufacturer that develops, manufactures and sells hasp, knob, box fitting, and fitting, mental stamping parts, etc.
We are specialized in manufacturing Furniture fasteners. We provide good service to new and old customers with more choices with brand innovation.
Packaging and shipping
Q: How can I get the sample to check the quality?
A: After price confirmation, you can require samples to check our product's quality.If you only need an existing mold sample from us to check the design and the quality. We will provide you sample for free as long as you afford the express freight.
Q: What is your term of delivery?
Q: What about the lead time of the mass production?